Water Tank Installation Process
Rainwater Tank Brochure
1.
This is the
Davey RainBank
system that automatically switches from rainwater tank to mains pressure and back again so you never run out of water.
2.
The
Davey RainBank
installed in its protective box.
3.
All rainwater travels through specially marked pipes.
4.
The tee connection outside each bathroom.
5.
The flexible hose connecting the toilet.
6.
The dual tap arrangement in the garden. Rainwater taps are clearly marked.
7.
The leaf buster to keep the water clean and clear.
8.
The water is once again filtered.
9.
The flush device where the first 30 litres are discarded. The overflow diversion can also be seen in this photo.
10.
The first flush device that drains the dirty water.
11.
The final 4500 litre tank installed.
Rainwater Tank Brochure
Top of Page
|
ecoPoint Home
Rain Water Tank Menu
Flexible Water Tanks
Colourbond Tanks
Poly Tanks
Wall Tanks
Water Tank Installation
Davey RainBank
Main Menu
Solar Panels
Solar Hot Water
Wind Power
Rainwater Tanks
Double Glazed Windows
EcoPatch
Useful Links / Add a Link
Contact ecoPoint